Built indoors.
Finished on your land.

Our climate-controlled factory in Dalarna turns certified timber into finished wall, floor and roof panels while your site is being prepared. Nothing waits for the weather, and nothing leaves until it passes inspection.

From timber to panel.

1

Timber Intake

FSC-certified spruce and pine arrive kiln-dried and are graded for strength before they are cut.

Day 1
2

CNC Cutting

Every stud, joist and opening is cut by machine from your approved drawings, with near-zero offcuts.

Week 1
3

Panel Assembly

Insulation, membranes, windows and services are fitted indoors, then each panel is sealed and tested.

Weeks 2-6
4

Final Inspection

An independent inspector checks airtightness and finish before the panels are wrapped for delivery.

Week 8

Checked at every stage.

Airtightness

Every home is pressure tested to Passivhaus limits before it leaves the factory.

Thermal Imaging

Infrared scans find any thermal bridge before the panels are sealed.

Waste Recovery

Offcuts are chipped for biomass heating, and packaging returns with the delivery truck.

Renewable Power

The factory runs on hydro and solar power bought through a long-term green contract.

Skilled Crews

Our joiners and electricians are employed by Modul, trained in-house and certified.

Let's design your home.

A 45-minute call with a Modul architect. No sales pitch. We look at your land, your brief, and give you an honest picture of what's possible and what it costs.

Book a Design Call